AP®︎ Environmental Science: Topic 4.6 Flashcards

Master key terms and definitions for Topic 4.6 of AP Environmental Science – Watersheds to help you prep for quizzes and the AP exam.


0%
11 cards total
11 not started
0 learning
0 almost done
0 mastered
Term

Watershed (Drainage Basin; Catchment)

Definition

The entire land area from which surface water drains to a common outlet, including the channels and surrounding runoff-contributing land

1 / 11
Watershed (Drainage Basin; Catchment)
Not Started

The entire land area from which surface water drains to a common outlet, including the channels and surrounding runoff-contributing land

ERT-4.FERT-4.F.1
Subwatershed
Not Started

A smaller drainage area feeding a tributary within a larger watershed

ERT-4.FERT-4.F.1
Headwaters
Not Started

The upper, commonly high-elevation reaches where a stream or river system begins

ERT-4.FERT-4.F.1
Tributary
Not Started

A smaller stream or river that flows into a larger one

ERT-4.FERT-4.F.1
Confluence
Not Started

The location where two flowing channels meet

ERT-4.FERT-4.F.1
Outlet (Discharge Point; Pour Point)
Not Started

The location through which water leaves the watershed being considered; the selected outlet determines the watershed's boundary and area

ERT-4.FERT-4.F.1
Drainage Divide (Divide)
Not Started

A ridge or other high ground separating adjoining watersheds, with runoff on opposite sides flowing toward different outlets

ERT-4.FERT-4.F.1
Watershed Area
Not Started

The total land area enclosed by the drainage divide and draining to the selected outlet

ERT-4.FERT-4.F.1
Watershed Length
Not Started

The approximate distance from the upper watershed or most distant headwaters to the outlet, which influences runoff travel time and discharge timing

ERT-4.FERT-4.F.1
Watershed Slope
Not Started

The change in elevation over horizontal distance; steeper slopes generally produce faster runoff and greater erosion

ERT-4.FERT-4.F.1
Watershed Delineation
Not Started

Starting at a specified outlet, trace upstream channels, identify surrounding high ground, and connect the ridges into a closed drainage-divide boundary

ERT-4.FERT-4.F.1